The behavior of inducted gas from liquid surface and the; power requirements in an agitated tank using a mechanical agitator are studied in order to increase the amount of gas self-induction and the gas retention time for gas absorption. A 45° six-blade downward impeller turbine was utilized in this study. Air and water, air and 40 wt% 60 wt%, and 80 wt% of glycerin water, and air and 106 cP silicon oil were employed as gas and liquid phases. Variables which were studied included geometrical factors (immersed depth of impeller, baffle with and diameter of impeller) and the physical properties of the liquid (viscosity, density, and surface tension). The correlations for the onset speed of impeller and power consumption after gas induction in the agitated tank are established from our experimental results. The amount of gas self-induction from the liquid surface in the agitated tank increases with increasing impeller diameter and speed and decreases with increasing baffle width, depth of impeller and viscosity of liquid. 相似文献
For 30 acid upland and hill soils, with initial pH from 3.5 to 5.8, and loss on ignition from 14% to 94%, cation exchange capacity varied with pH according to the relationship CEC = m pH+C, where m and C are characteristic of each soil. The slope m depended on loss on ignition (LOI), and is given by: m=Δ CEC/Δ=0.22 LOI+1.92. Because of these relationships, CEC measured at the natural pH of the soil (in 0.025 M MgSO4 solution) is more relevant to field conditions than a conventional measurement at pH7. An improved method for estimating lime requirement (LR) of these soils was developed, based on the relationship found between LR and the difference in CEC (ΔCEC) between that at the natural pH of the soil and that at the target pH of 5.5: LR=1.12 ΔCEC+1.48. Lime requirement can therefore also be estimated from loss on ignition using the earlier relationships, and is given by: LR=(0.25 LOI+2.15) Δ+1.48, where Δ is the difference between the natural pH (in 0.025 M MgSO4) and the target pH. Predictions based on this agreed well with results for a further 10 soils. 相似文献
A computerised trace method has been developed for determining the relationships of assembly requirements with design dimensions
and tolerances of the components in an assembly, and the relationships of design specifications and machining allowance requirements
with manufactured dimensions and tolerances of the component in a process plan. This method traces from the proposed components
or planned operations only the dimensions and tolerances that affect the given requirement, and therefore the equations for
design or for manufacture can be established simultaneously and accurately. Hence it is possible to establish constraints
for the optimisation of dimensions and tolerances for design or for manufacture. 相似文献
Britain's new offshore oil industry might have generated much additional employment especially in the building, manning and supply of rigs. But there was a failure at first to take proper advantage; little was done to train people in new skills. Consequently the oil companies brought in equipment and skilled personnel from abroad. Eventually efforts were made to improve matters and the paper examines the steps taken to bring more of the employment benefits to Britain, but finds only partial success. 相似文献
Istanbul is one of the most famous historical cities in the world. However, the project alignment selected as the best of a range of alignments cannot avoid passing beneath the historical and cultural heritages of Istanbul as well as under ancient and densely inhabited areas of the city. This paper will explain some of the challenges related to the bored tunnels.
Historical buildings are vulnerable. Yet many existing residential and office buildings are old and constructed on minimal foundations. As a consequence, it is vital that any drawdown of groundwater and any ground settlements have to be minimized.
In addition, the connection between the immersed and bored tunnels will be made directly and totally underground, without the usual intermediate shafts and beneath the deep waters of the Bosphorus Strait. This operation needs the utmost control of the tunnel excavation face to ensure its stability and to minimize water ingress. Based on such considerations, tunnel excavation by tunnel boring machine (TBM) using a slurry shield and having the ability to operate under high pore pressures was recommended as the method of excavation for the main running tunnels.
The paper will explain how the design team from Avrasyaconsult – the Employer’s Representative – arrived at the final minimum, specific and functional requirements of the bored tunneling works which are to be carried out using the ‘FIDIC EPC/Turnkey Project’ conditions. 相似文献